Projects

  PENDİK TAVŞANTEPE ROAD AND JUNCTION CONSTRUCTION
  1 underpass and 1 overpass located on E5 highway. Overpass has been constructed with 2 spanned bridge as prestressed system on 1 middle support and 2 side supports. Overpass junction bridge with 2x2 lanes has been constructed by using prestressed beams with 24 meters lengths. Underpass bridge has been constructed on E5 highway as in-situ casted closed box section. Approach walls of underpass executed as bored piled with diameters of Ø120 mm and Ø100 mm. Lateral roads with total length of 12 km and with 1x2 lanes and retaining walls have been constructed also. Displacement of water pipeline with diameter of Ø2200 which belongs to İSKİ authority, displacements of 20” diameter İGDAŞ steel pipeline, sewerage water and storm water lines with various diameters and displacement of electric lines of AYEDAŞ authority have been executed. .fiber optic lines of İBB (İstanbul Metropolitan Municipality) and renewal of lines of Turk Telekom authority have been executed. Road and Lightening works of 12 km length of road, underpass bridge and overpass bridge have been executed in scope of this project.