Projects

  PENDİK-ESENYALI INTERCHANGE CONSTRUCTION
  Construction of Prestressed system in-situ casted 90 meters length bridge with 1x2 lanes, total of 3 spanned 2 is in middle and with side supports with total width of 12 meters have been executed. Connection Roads of the junction and total of 2.500 m length of 1x2 laned urban roads with addition of the lateral roads of E5 road has been constructed.