  BEŞİKTAŞ ETİLER TEM CONNECTION ROAD CONSTRUCTION
  Construction of road with total length of 8 km and with 2x2 lanes. Closed section in-situ casted underpass and overpass bridges have been constructed which have 2 lanes with 10 meter width and length of its closed section is 30 meters. At the same time construction of underpass and overpass bridge with 24 meters span and 1x2 lanes executed by prestressed system foundation foots with Ø100mm bored pile column. In addition to these carrying capacity of the open section river passing under the road with total length of 240 meters has been increased and its construction has been executed with 3x2 lanes. Many displacement works and renewing works of the lines belong to the various authorities such as (İGDAŞ, BEDAŞ, İSKİ, TÜRKTELEKOM, İBB) have been executed in this project also. Construction of retaining walls and 6.500 m² paneled earth filled supporting’s have been constructed for the roads which are executed as urban access roads.