Projects

  SEYRANTEPE-TEM HIGHWAY UNDERPASS AND OVERPASS, ROAD, JUNCTION CONSTRUCTION
  4 prestressed overpass bridge with 22 m span length, single spanned and 2x2 lanes, 1 prestressed overpass bridge over TEM Highway with 4 span and total length of 90 m and with 2x1 lanes, 1 prestressed viaduct lateral road with 6 span, 24 meters length and 2x1 lanes on TEM highway, 1 prestressed tunnel for passing of vehicles with 2x1 lanes and 120 m length by cut-cover method, lateral road construction with 3x1 lanes with length of 6.500 m and 2x1 lanes with length of 5.500 m, electric lightening works, 4 overpass bridge strengthening works, displacement works of Nato pipeline, displacement works of high voltage power line, Road construction with piled shoring system on lateral road with length of 46.000 m, storm water line construction works, river Reclamation works and Road Paving works of road with 12.000 m length.