Projects

  ADDITIONAL BRIDGE CONSTRUCTION FOR ATAKÖY E-5 JUNCTION
  1 Prestressed Interchange construction with 3x1 lanes, 4 spans and 18 m length, construction of 1 prestressed underpass and overpass with 3x1 lanes, single spanned and 22 m length, 4 connection road to junction with 2x1 lanes, open section 1 river Reclamation works with width of 14 m and with length of 250 m, storm water line construction with various diameters and lengths, special system demolishing works of 1 double spanned, prestressed bridge with length of 90 m, construction of lateral roads with piled shoring system and with length of 2.000 m.